The Project
The Thames Tideway Scheme is a huge overhaul of the current sewage system in London, which has seen rapid growth of the capital putting a strain on the current systems that have been in place since the 1800s. Originally as a precautionary method the London sewerage system was designed to allow overflow into the Thames River. This is no longer a viable option, and as such the scheme intends to solve this problem with a 16-mile tunnel running under the Thames, due to open in 2023.
Lee Tunnel is the first phase of this, running from Abbey Mills Pumping Station to Beckton Sewage Treatment Works, the tunnel will collect 16 million tonnes of sewage annually, depositing it at a treatment plant where the reprocessed water can be recycled into the Thames. This project has been the deepest tunnel bored in London to date, exceeding the London Underground and the Crossrail excavations.
The Outcome
Our contract management software was a key component for this £635m, four-mile long NEC3 ECC Option C project to prevent 16 million tonnes of sewage discharging into the River Lee each year. Completed in 2016, this six-year project benefited from the CEMAR platform's collaborative environment for contract administration and reporting. Within the CEMAR system over 5,000 communications were administered, each one NEC3 compliant, as well as being accessible, auditable and consistent.
The Client
"CEMAR provides an invaluable tool with its efficient administration. It is user-friendly and provides immediate real-time reporting. There has been universal approval by both those involved in day-today contract administration and those needing access to the data held within the system."
Mark Sneesby, Project Manager, CH2M Hill
"The CEMAR system has been, and continues to be, an exceptionally effective and efficient tool to proactively manage contract administration for the Project, in accordance with the contractual requirements and obligations, providing optimum visibility of issues for many users to observe."
Francois Pogu, Project Director, MVB
Reference: Imagery source; ©Matt Joseph.
United Utilities Water Framework Adopts Contract Management Solution
thinkproject is providing contract management administration to facilitate the implementation of a suite of NEC3 contracts, including Term Service and Engineering Construction contracts, via the CEMAR contract management solution. The programme will continually improve local communities, both in terms of household savings and improved environments to live in.
Efficient Management Communication for Construction of Desalination Plant Tuas 3
Tedagua, a company belonging to the Cobra Group, with experience in the design, manufacture, operation, maintenance and engineering of desalination plants, was commissioned to carry out the Tuas 3 desalination plant project in Singapore. thinkproject enables teams to access the latest versions of documents securely, regardless of location or time.
Objection Management System for the Fehmarn Belt Fixed Link Tunnel
The Fehmarn Belt Fixed Link Tunnel (also known as the Baltic Sea Tunnel) will be the world’s longest immersed tunnel. Once open it will consist of a double-track railway and a four-lane motorway spanning a total of 18km. The tunnel's construction currently represents the largest transportation project in Northern Europe and is one of the largest infrastructure projects in the world.