The Client
As the UK’s national weather service, the Met Office are responsible for meteorological estimates, from daily weather forecasts to climate change predictions. They are intrinsic to the day-to-day running of various businesses, including weather forecasting that can affect consumer trends and safety measures for travel across the UK. Originally established in 1854 as a service to mariners, the Met Office began providing weather forecasts to newspapers in 1861, which has led them to their esteemed position today.
The Project
Across a range of sites in the UK, Met Office have begun using NEC3 contracts for their facilities management, including both hard and soft maintenance. thinkproject's CEMAR software has been adopted for their NEC3 Terms Service contracts to help with contractual administration.
Challenges
Adopting new forms of contracts can be a challenge for teams that may be unfamiliar with their inner workings. The CEMAR platform is built with NEC compliance in mind, and with the integrated NEC E-learning feature, teams can be guided in the right direction.
Solutions
Met Office benefit from using a contract management solution that can span all their sites. Our CEMAR software provides contract administration between the client and their contractors conveniently via web browser, in real-time, providing a fully auditable trail to manage the maintenance phases of several projects.
Outcome
The up-to-date events management ensures any issues can be dealt with swiftly, leaving Met Office and their contractors free to focus on the job, rather than spending valuable time on administrative duties. The collaborative nature of using the CEMAR tool, which is intrinsic to NEC culture, leads to greater levels of problem-solving and an openness which can be nurtured for future projects.
Image courtesy of Met Office
Fostering an Open and Collaborative Environment with thinkproject's Contract Management System
In 2016 James Fisher Nuclear (JFN) were awarded one of the leading decommissioning projects; the segmentation, packaging and export of the Steam Generating Heavy Water Reactor. The project is using NEC3 Engineering Construction Contracts and Subcontracts with our CEMAR software to help facilitate this milestone project.
Digitised and Automated Management for Bruckner Tower
The new Bruckner Tower is being built in the north of Linz, on the site of the former Bruckner University. This new high-rise building will be compromised of a wide range of living, working and educational facilities to benefit the surrounding community, as well as providing housing. The client L-Bau-Engineering already use thinkproject as its standard platform for construction and engineering projects.
Sicilia contará con uno de los mayores parques de energía solar de Italia
Solarinvest, una empresa con sede en Viena dedicada al desarrollo de instalaciones de energía solar, comenzó en julio de 2010 la construcción de una planta de 8,4 MW de energía solar con una superficie de 25 hectáreas en la provincia de Ragusa, Sicilia.