Kraj / Region | Singapur |
Branża | Energia i woda |
Project
The population growth experienced by Singapore has significantly increased the city's consumption of drinking water. Tedagua, a company belonging to the Cobra Group, with experience in the design, manufacture, operation, maintenance and engineering of desalination plants, was commissioned to carry out the Tuas 3 desalination plant project in Singapore.
Currently, desalinated water satisfies a quarter of the water demand in Singapore. With the construction of this third plant, Tuas 3, and a fourth scheduled for 2020, it is expected to cover 30% of the water needs in Singapore by 2060.
Challenges
The geographical dispersion of the different work teams, as well as the large volume of information and documents that are handled daily on a project of such magnitude, caused Tedagua to decide to implement thinkproject as a collaboration tool, together with its partner on the project, HSL Constructor Pte Ltd.
Solutions
The project's configuration is based on the management of information (deliverables) and their internal distribution. It also incorporates Outlook Connect for the storage and classification of all emails related to the project (approximately 30,000 to date).
thinkproject enables teams to access the latest versions of documents securely, regardless of location or time. The efficient management of communications via the platform ensures all project teams receive accurate and uniformed information.
Outcome
Tuas 3 is the first project that Tedagua has entrusted to thinkproject to standardise work processes and information management, both internally and with collaborators.
These already implemented improvements have been increasing as the configuration of the Tedagua projects has required it, today possessing a very broad functional scope on projects around the world.
Testimonial
“thinkproject has greatly facilitated the necessary traceability on a project with such an excessive documentation load. We have managed to reliably control our exchanges of documentation with clients and subcontractors, as well as the flow of productive communications between the different areas involved.”
- Document Controller, Tedagua
Jak dostawca energii zarządza swoimi projektami budowlanymi?
Firma Vattenfall Europe Generation AG, jako spółka odpowiedzialna za realizację projektów od strony inwestorskiej, prowadzi wszystkie bieżące projekty budowy nowych elektrowni Vattenfall. Wartość realizowanych obecnie projektów wynosi pięć miliardów euro.
Power Plant Construction Management Software for E.ON
thinkproject supports the Maasvlakte Power Plant construction management, where E.ON manages major challenges with communication between all project members, as well as comprehensive management of drawings and documents, all of which is tailored to E.ON’s internal processes.
Energia rodzi się w głowie
E.ON, jak każde duże przedsiębiorstwo, posiada złożoną strukturę informatyczną, niezbędną dla zapewnienia wydajniejszego zarządzania procesami biznesowymi oraz wspierania realizacji zadań w ramach obszarów funkcyjnych. Jednak ze względu na, konieczność, wąskiego zdefiniowania reguł w systemie informatycznym E.ON, osoby z zewnątrz oraz uczestnicy procesu mają ograniczony dostęp do systemów wewnętrznych. Konieczne było więc znalezienie optymalnego rozwiązania dla tych procesów komunikacji.