Kraj / Region | Rosja |
Branża | Energia i woda |
Project
Industrial growth in Eastern Siberia has led to an increased demand for electricity, strengthening the need for additional power stations in the area. In 2007 E.ON acquired the BGRES-3 Ignite-fired and Berezovskaya power stations, with the intention of expanding both sites to accommodate growing demand in the region. The project commenced in 2011 under the management of E.ON New Build & Technology (ENT) in collaboration with Unipro (formerly E.ON Russia). Total project investment amounts to around 1bn Euros, with commissioning planned for 2014. thinkproject has been implemented as ENT’s standard solution for all its new plant construction projects.
Solutions
The project platform supports the central organisation of all correspondence between ENT in Germany, Unipro, as well as Russian general contractor and personnel at the local construction site. Each of the approximately 15,000 letters are managed as a task via thinkproject until it is completed or answered.
Quality control plans and documents are also processed via thinkproject. For example; the general contractor sends document packages to E.ON for the formal checking. As soon as the documents are approved the general contractor uploads them to the platform. Following special implemented rules in thinkproject the documents are distributed automatically to the responsible approver.
Outcome
Team members can work in their preferred language setting due to the complete graphical user interface, saving time manually translating and providing multilingual information management. The language settings includes individual filters, document properties and value lists which can now be implemented in German, English and Russian.
Client
Energy provider E.ON operates in over 30 countries, serving over 33-million customers. Based in Essen, since 2000 the company has gone from strength to strength with a series of mergers and acquisitions. E.ON operates in several energy areas including nuclear and renewable energy.
Fostering an Open and Collaborative Environment with thinkproject's Contract Management System
In 2016 James Fisher Nuclear (JFN) were awarded one of the leading decommissioning projects; the segmentation, packaging and export of the Steam Generating Heavy Water Reactor. The project is using NEC3 Engineering Construction Contracts and Subcontracts with our CEMAR software to help facilitate this milestone project.
Efficient Management Communication for Construction of Desalination Plant Tuas 3
Tedagua, a company belonging to the Cobra Group, with experience in the design, manufacture, operation, maintenance and engineering of desalination plants, was commissioned to carry out the Tuas 3 desalination plant project in Singapore. thinkproject enables teams to access the latest versions of documents securely, regardless of location or time.
Power Plant Construction Management Software for E.ON
thinkproject supports the Maasvlakte Power Plant construction management, where E.ON manages major challenges with communication between all project members, as well as comprehensive management of drawings and documents, all of which is tailored to E.ON’s internal processes.